DETAILS
-
2013/12/24
-
Implementation Status and Results Report
-
ISR12982
-
1
-
1
-
2013/12/24
-
Colombia - Second Disaster Risk Management DPL with Catastrophe Deferred Draw Down Option : P126583 - Implementation Status Results Report : Sequence 03
-
watershed management plan
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 173
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Dickson,Eric.
Colombia - Second Disaster Risk Management DPL with Catastrophe Deferred Draw Down Option : P126583 - Implementation Status Results Report : Sequence 03 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/433721468242398677