Skip to Main Navigation

Mali - Energy Support Project : procurement plan : Mali - Plan de passation marches : procurement plan (French)

Details

  • Document Date

    2010/01/18

  • Document Type

    Procurement Plan

  • Report Number

    54552

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Mali,

  • Region

    Africa,

  • Disclosure Date

    2010/07/01

  • Disclosure Status

    Disclosed

  • Doc Name

    Mali - Plan de passation marches : procurement plan

  • Keywords

    access roads, access to electricity, access to energy, access to energy services, Accounting, Action Plan, action plans, additional financing, audits, average growth, Balance, Balance Sheet, Bank financing, Bank Involvement, Bank management, beneficiaries, Borrower, calculations, capacity building, capacity-building, capital investment, Carbon, Carbon Dioxide, cash advance, Cash Flow, Clean Development Mechanism, commercial bank, commodity, compact fluorescent lamps, competitiveness, consultation processes, consumer, contribution, control systems, corruption, Credits, CURRENCY, Debt, Debt Service, decision making, delivery mechanisms, demand for electricity, demand management, Development Bank, diesel, direct connection, distribution losses, distribution network, distribution networks, distribution system, drought, economic activities, Economic Analyses, Economic Analysis, economic development, economic growth, economic value, efficient lighting, electric grid, Electricity, electricity demand, electricity production, electricity supply, electricity tariff, electricity tariffs, Electricity Utility, emissions, Employment, employment opportunities, energy bills, energy consumption, Energy Demand, Energy Efficiency, energy efficiency investments, Energy Management, energy pricing, energy production, Energy Supply, entitlements, Environmental, environmental consequences, Environmental Management, equilibrium, equipment, Equipments, ESP, Exchange Rate, exchange rates, Expenditures, Finances, Financial Analyses, Financial Analysis, Financial Covenants, financial health, Financial Management, financial management system, financial performance, Financial Reports, financial resources, financial situation, financial support, financial sustainability, financial viability, Financing Plan, fishing, Fluorescent Lamp, fraud, Fuel, generation, generation capacity, Greenhouse Gas, growth potential, Harmonization, households, hydroelectric plant, hydroelectric power, Impact Assessment, Impact Assessments, implementation period, implementing agencies, imports, Income, increase in incomes, infrastructure development, infrastructure investments, Innovation, installation, institution, interest rate, International Bank, international consultants, International Finance, international standards, Investment Bank, investment climate, investment program, investments in energy, legal framework, life expectancy, lifetime, liquid fuel, living conditions, Loan, local media, macroeconomic stability, maintenance costs, material, operational efficiency, payment method, peak demand, Peak load, Phone, Policy Framework, pollution, Population growth, potential investors, Power, Power Generation, Power Generation Expansion, power lines, Power plant, power production, power sector, power station, power stations, power system, power systems, present value, private sector, private sector development, privatization, probability, Procurement, procurements, production capacity, productivity, project management, protocol, public administration, Public Expenditure, public facilities, Public Finance, purchasing power, regional network, regulatory authority, reliability, repayment, residential consumers, responsibilities, result, Results, Risk Assessment, rural electrification, Rural Energy, sales, savings, sites, social issues, stakeholder, stakeholders, Structural Adjustment, Supervision, Sustainable Development, targets, tariff levels, Technical assistance, technical skills, thermal capacity, Thermal Plant, thermal plants, Thermal Power, timely payment, transaction, Transmission, transmission line, transmission lines, Union, Universal Access, urban areas, urban population, uses, utilities, valuable, vehicles, Voltage, willingness to pay, withdrawal, worth

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Mali - Energy Support Project : procurement plan : Mali - Plan de passation marches : procurement plan (French). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/434941468049759615/Mali-Plan-de-passation-marches-procurement-plan