Skip to Main Navigation

Afghanistan - Mazar-e-Sharif Gas-to-Power Project : Environmental and Social Impact Assessment (English)

The Mazar-e-Sharif Gas-to-Power Project for Afghanistan will utilize natural gas to be supplied by Afghanistan’s Ministry of Mines and Petroleum - Afghan Gas Enterprise from existing gas fields located 100 km west of the project site near Sheberghan in Jowzjan province, Afghanistan. Some of the negative impacts and mitigation measures include: (1) ensuring that design, construction and operation of the structural elements or components of the project...
See More

DETAILS

  • 2018/11/01

  • Environmental Assessment

  • 142068

  • 1

  • 1

  • Afghanistan,

  • South Asia,

  • 2019/09/24

  • Disclosed

  • Environmental and Social Impact Assessment

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Green Tech Construction and Engineering Co..

Afghanistan - Mazar-e-Sharif Gas-to-Power Project : Environmental and Social Impact Assessment (English). Afghanistan : Green Tech Construction and Engineering Company. http://documents.worldbank.org/curated/en/436721569357718324

This document is being processed or is not available.