Skip to Main Navigation

India - Mahanadi Barrages Project (English)

Details

  • Document Date

    1991/10/07

  • Document Type

    Project Completion Report

  • Report Number

    9980

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    India,

  • Region

    South Asia,

  • Disclosure Date

    2010/06/18

  • Disclosure Status

    Disclosed

  • Doc Name

    India - Mahanadi Barrages Project

  • Keywords

    Central Water and Power Research Station;cubic meters per second;Economic Rate of Retum;extension of closing date;average per capita income;Water Management;possession of land;quality of work;bank supervision missions;world market price;accrual of benefit;flood control work;event of failure;rates of return;water supply system;acquisition of land;construction and equipment;water distribution system;loss of work;central water commission;weights and measure;quantity of water;physical development;Planning and Financial;Supply of Water;enforcement of contract;irrigation;black clay;subgrade reaction;reinforced concrete;cropping pattern;drainage system;project costing;irrigation system;mathematical model;high flood;bearing capacity;construction machinery;remote control;drainage channel;land consolidation;construction schedule;life expectancy;concrete mixer;water loss;bank's performance;discharge capacity;reservoir level;water level;canal system;power shortage;contract services;power supply;prestressed concrete;civil works;construction method;statistical table;construction period;borrower's performance;project execution;dry season;irrigated area;cement concrete;downstream protection;river diversion;flow rate;allocating water;lessons learnt;base pressure;sand drain;submersible pump;hydraulic jump;earth pressure;vertical acceleration;fish pass;hydraulic model;hydraulic design;road bridge;vertical load;flood season;reclaimed water;retaining wall;small fraction;agriculture extension;project startup;construction equipment;technical expertise;geological exploration;court intervention;subsequent years;remedial measure;crop output;farm income;contract provision;weir structure;exploration result;river training;professional association;labor-intensive technique;construction methodology;water pressure;positive impact;integrated development;severe flood;concrete block;wet season;electric supply;construction area;delta formation;diversion weir;water movement;groundwater table;topographical survey;surface irrigation;ground water;pumping units;working population;flood damage;flood damages;main canals;agriculture sector;encroached land;construction quality;project engineer;extension service;cumulative effect;field work;operational performance;protective apron;heavy flood;modernization program;construction site;evaluation model;institutional aspect;site selection;socio-economic development;physical indicator;flood drainage;porous concrete;job requirement;agricultural production;cultivation method;research service;Bank Credit;water course;irrigation season;dwelling house;palm tree;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

India - Mahanadi Barrages Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/446381468050653735/India-Mahanadi-Barrages-Project