Vietnam - Mekong Transport Infrastructure Development Project : resettlement action plan (Vol. 9) : Sub project resettlement plan of Tri Ton Canal : at Tinh Bien District - an Giang province (English)

The resettlement policy principles to be followed in the Vietnam Mekong Transport Infrastructure Development Project are: Acquisition of land and other assets, and resettlement of people will be minimized as much as possible. All displaced persons residing, working, doing business or cultivating land within the recovered area under the Project as of the cut-off-date are entitled to be provided with rehabilitation measures sufficient to assist them to improve or at least maintain their pre-Project living standards, income earning capacity, and production levels. Lack of legal rights to the assets lost will not bar displaced persons from entitlement to such rehabilitation measures. Rehabilitation measures include: (1) compensation at replacement cost without deduction for depreciation or salvage materials for houses and other structures; (2) priority given to in-kind compensation, for example, agricultural land-for-land of equal productive capacity acceptable to the displaced person; (3) transportation and subsistence allowances, and (4) business loss or income rehabilitation allowances. If there is no land available for "land for land" compensation or if the displaced person so chooses, then cash compensation may be given. If displaced persons lose more than 20 percent of their agricultural land holdings, the project will also provide rehabilitation assistance. The resettlement transition period will be minimized and the rehabilitation measures provided to displaced persons no later than one month prior to the expected start-up date of civil works in the respective Project site. Plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with displaced persons to ensure minimal disturbance. Entitlements will be provided to displaced persons no later than one month prior to the expected start-up of civil works at the respective project site. The previous level of community services and resources will be maintained or improved.

Details

  • Author

    Royal Haskoning The Louis Berger Group, Inc.

  • Document Date

    2009/12/01

  • Document Type

    Resettlement Plan

  • Report Number

    RP456

  • Volume No

    9

  • Total Volume(s)

    10 (See all volumes)

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2012/03/12

  • Disclosure Status

    Disclosed

  • Doc Name

    Sub project resettlement plan of Tri Ton Canal : at Tinh Bien District - an Giang province

  • Keywords

    compensation for loss;per capita monthly income;compensation for land;restoration plan;agricultural land;compensation in cash;inland waterway;price of land;Resettlement Policy Framework;income of household;land and housing;land and water;average market price;per capita income;land use right;compensation plan;replacement cost;allowance policy;lost land;land compensation;residential land;Natural Resources;production system;compensation policy;price contingency;social security;survey population;land area;ownership status;land price;legal right;business income;poor household;residential area;education status;construction area;external monitoring;average distance;power line;damaged house;state management;land loss;household income;compensation rate;age structure;shore line;asset price;crop price;agricultural production;resettlement area;water pipe;compensation payment;living condition;social network;support policy;resettlement monitoring;Social organizations;unit price;marginal impact;navigation aid;flood season;ethnic composition;ethnic households;vulnerable group;fish pond;rice drying;damaged structures;issue price;common ownership;fruit tree;rice plant;natural conditions;standing trees;education level;repayment period;grace period;loan term;compensation calculation;wooden frame;socioeconomic status;Ethnic Minorities;Land Ownership;road traffic;route length;living standard;arable land;application requirement;population size;fresh water;population area;young people;Production Development;land right;family life;waterway transport;loan problem;farmers society;young population;labor resource;age composition;resettlement cost;credit funds;social activities;social assistance;Social Welfare;transportation cost;socioeconomic development;procurement regulation;state policy;house purchase;audit services;agricultural expansion;Elderly People;business association;farmer association;information dissemination;finding work;site planning;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Royal Haskoning The Louis Berger Group, Inc.

Vietnam - Mekong Transport Infrastructure Development Project : resettlement action plan (Vol. 9) : Sub project resettlement plan of Tri Ton Canal : at Tinh Bien District - an Giang province (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/448721468317990011/Sub-project-resettlement-plan-of-Tri-Ton-Canal-at-Tinh-Bien-District-an-Giang-province