India - Lucknow-Muzaffarpur National Highway Project : environmental assessment (Vol. 20) : Final EMP Package-III-Lucknow-Ayodhya Stretch on NH-28 including Faizabad Bypass (English)

This is an environmental assessment for the Lucknow-Muzaffarpur National highway Project, which improves road and port transport in India. This report assesses the likely negative environmental impacts and proposed measures to mitigate them. Among them are the following: For every tree felled, two trees will be transplanted and nurtured for two years to ensure tree survival. Soil erosion will result from tree cutting, clearing of roadside vegetation, and unmanaged run-off from equipment washing-yards. Minimize soil erosion by providing slope protection on embankments abutting water bodies by providing brick pitching, stone pitching, Gabion structures, as applicable. Provide retaining walls. For gentler slopes, turf with shrubs and grasses. Excavation of riverbeds and banks will increase sediment load downstream of the bridge site. To minimize soil contamination, provide oil-intercepting chamber to treat surface run-off, provide impervious floor-beds under parking areas, and maximize and reuse of construction wastes and dispose of unusable wastes and hazardous materials. Access roads and vehicle movements will avoid sensitive routes and heavy machinery will not be used on productive land to minimize soil compaction. Cover vehicles to prevent spills and transport borrow materials during daytime only. Use sprinklers to wash down roads and suppress dust emissions during soil transport After activity ends, redevelop borrow pits by converting to dumping sites, redeveloping for commercial use as fish ponds or as constructed wetlands as community-based wastewater treatment facilities. Plant dust screening vegetation along roadsides and at locations sensitive to air pollution like schools, hospitals, etc. Use traffic detours and diversions to minimize traffic bottlenecks. To reduce impacts to water resources, site construction camps away from sensitive water resources, prepare temporary drains to dispose of eroded settlements, providing sedimentation/septic tanks, ditches and drains to catch run-off, and provide oil-interceptors and riparian buffers. To avoid flooding, raise highway embankments, provide balancing bridges, culverts, and boulder aprons. Lessen noise by using noise absorbing building materials, planting noise absorbing trees, provide workers with ear plugs and helmets and generally prevented from prolonged exposure to high noise levels, and prohibit batching and hot mix plants within the vicinity of schools, hospitals, etc. In case of finding any rare/endangered animal species during construction, inform the wildlife authorities.

Details

  • Author

    Operational Research Group; Spatial Decisions; DHV; MDP Consultants

  • Document Date

    2004/08/01

  • Document Type

    Environmental Assessment

  • Report Number

    E895

  • Volume No

    20

  • Total Volume(s)

    21 (See all volumes)

  • Country

    India,

  • Region

    South Asia,

  • Disclosure Date

    2010/07/01

  • Doc Name

    Final EMP Package-III-Lucknow-Ayodhya Stretch on NH-28 including Faizabad Bypass

  • Keywords

    Environmental and Social Impact;numbers of trees;degradation of water;waste disposal facility;surface water body;land use change;night time noise;balanced regional development;ambient air quality;provision of road;ground water source;thermal power plant;hazardous chemical;vehicle parking area;contamination of soil;local solid waste;fly ash;mitigation method;construction work;water bodies;land acquisition;agricultural land;construction site;noise barrier;haul roads;community properties;project road;disposal site;construction period;construction stage;flood control;wild life;protection cost;tube wells;noise level;tree sapling;labor camp;irrigation purpose;noise pollution;safety measure;water system;irrigation canal;potable water;soil pollution;sewerage system;restoration plan;land agencies;cultural structure;native plant;traffic diversion;hand pump;pavement surface;climatic parameter;civic authority;survival rate;temporary diversion;human settlement;acceptable limit;perennial streams;monitoring plan;cultural property;religious structure;plant location;labor requirement;environmental hazard;ambient noise;ground level;worker camp;railway crossing;exhaust emission;child labor;soil erosion;seismic map;community water;objection certificate;rigid pavement;flexible pavement;religious property;budgetary resource;traffic intensity;household use;cutting cost;sensitivity analysis;slope protection;bore well;precautionary measure;ancillary activities;embankment construction;concrete work;raw material;environment management;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Operational Research Group; Spatial Decisions; DHV; MDP Consultants

India - Lucknow-Muzaffarpur National Highway Project : environmental assessment (Vol. 20) : Final EMP Package-III-Lucknow-Ayodhya Stretch on NH-28 including Faizabad Bypass (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/450021468752725920/Final-EMP-Package-III-Lucknow-Ayodhya-Stretch-on-NH-28-including-Faizabad-Bypass