Details
-
Author
-
Document Date
2020/12/27
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR44986
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/12/27
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Third Highway Project - P118023 - Sequence No : 23
-
Keywords
road user cost; motorway standard; motorway network; risk category; Investment Project Financing; construction of road; safety audit; road service; network upgrading; operation risk; gender information; motorway maintenance; contract clause; state road
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Valiyev,Nijat
Disclosable Version of the ISR - Third Highway Project - P118023 - Sequence No : 23 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/456411609085116076/Disclosable-Version-of-the-ISR-Third-Highway-Project-P118023-Sequence-No-23