Details
-
Author
-
Document Date
2019/12/17
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR39874
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2019/12/17
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Freetown Emergency Recovery Project - P166075 - Sequence No : 04
-
Keywords
Disaster Risk; disaster preparedness; high risk area; length of road; Investment Project Financing; delivery infrastructure; preparedness activity; critical infrastructure; government capacity; water pipe; water infrastructure; operation risk; risk category; contingency plan; piped water; result indicator; satisfactory progress
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Reid,Robert Curle Jesse
Disclosable Version of the ISR - Freetown Emergency Recovery Project - P166075 - Sequence No : 04 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/462321576601140175/Disclosable-Version-of-the-ISR-Freetown-Emergency-Recovery-Project-P166075-Sequence-No-04