Details
-
Author
-
Document Date
2016/06/27
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR24125
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Brazil - Mato Grosso do Sul State Road Transport Project : P118410 - Implementation Status Results Report : Sequence 12
-
Keywords
monitoring and evaluation system;road management system;operational management;Transport and ICT;road transport infrastructure;state investments;management tool;investment loan;efficiency improvement;investment program;road infrastructure;efficiency gain;improved accessibility;logistics cost;result indicator;surface road;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Gauthier,Gregoire Francois
Brazil - Mato Grosso do Sul State Road Transport Project : P118410 - Implementation Status Results Report : Sequence 12 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/462601467066319994/Brazil-Mato-Grosso-do-Sul-State-Road-Transport-Project-P118410-Implementation-Status-Results-Report-Sequence-12