The North China Earthquake Reconstruction Project will support a program to be carried out in 1990 and 1991 consisting of : a) a village reconstruction program for about 80 villages in the four counties of Shanxi Province's Yanbei Prefecture and about 70 villages in Hebei Province's Yangyuan County, including reconstruction of about 24,000 collapsed dwelling rooms, and rehabilitation, repair and reinforcement of about 49,500 others, reconstruction of about 1200 public facility rooms and repair and reinforcement of about 1200 others, reestablishment and repair of critical village infrastructure of power lines and water supply and repair of damaged buildings of about a dozen rural enterprises in the five counties, and b) a national component of assistance for earthquake prediction and disaster relief preparedness, including upgrading and reinforcement of the State Seismological Bureau's national seismic monitoring network for monitoring and prediction and the drawing up of a model emergency preparedness plan for Yanbei prefecture.

Details

  • Document Date

    1990/01/18

  • Document Type

    President's Report

  • Report Number

    P5219

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/06/24

  • Disclosure Status

    Disclosed

  • Doc Name

    China - North China Earthquake Reconstruction Project

  • Keywords

    rural water supply;earthquake prediction;planning and design;village water supply;emergency preparedness plan;per capita income;loss of life;water supply works;foreign exchange risk;disaster preparedness plan;reconstruction and rehabilitation;annual interest rate;degree of sophistication;passive solar heating;foreign exchange requirement;Urban Water Supply;expansion of capacity;power transmission line;local financial institution;central government subsidies;poor rural county;indication of interest;construction of school;construction of housing;emergency preparedness program;grain storage facility;procurement and disbursement;prevailing interest rate;flow of fund;weights and measure;rehabilitation of facility;rural area;building repair;local industry;civil works;community facility;Public Facilities;budgetary allocation;rural enterprise;financial intermediaries;rural housing;appraisal mission;organizational arrangement;rural health;irrigation channel;damage assessment;public building;power line;labor input;reconstruction work;seismic risk;financing plan;earthquake damage;Financing plans;seismic activity;death toll;Housing reconstruction;temporary shelter;natural disaster;affected villages;local economy;lending criterion;maturity period;housing stock;credit proceeds;telecommunications line;sea level;grace period;cost sharing;earthquake reconstruction;land area;seismic zones;middle school;metropolitan area;seismic monitoring;monitoring network;private housing;community building;satellite communication;production loss;infertile soil;social facility;stone construction;construction material;monitoring stations;earthquake shock;property damage;price contingency;enterprise rehabilitation;prefecture governments;appraisal method;short supply;personnel cost;existing credit;Communications Network;Public Services;annual budget;financing arrangement;concessional term;damaged house;highway construction;community effort;project costing;village enterprise;provincial authority;free market;credit channels;access road;sanitary facility;deep water;building standard;partial coverage;communications links;engineering geology;forestry development;traditional housing;earthquake intensity;heating plant;hydraulic structure;digital equipment;seismic vulnerability;research effort;underground water;monthly reports;winter season;national network;regional transmission;village house;adequate water;computer program;local revenue;commercial company;environmental hazard;vulnerability assessment;construction technique;building collapse;retained earnings;computer equipment;individual enterprise;village relocation;private donations;provincial grants;cash saving;project financing;village program;disaster emergency;insurance settlement;chemical spill;masonry walls;water resource;Town Planning;relative poverty;proiect management;organizational structure;reconstruction activities;building code;health post;adobe houses;construction method;electric pump;Mortar Shell;concrete frame;land use;local contractor;construction engineer;written agreement;financial implication;community labor;investment need;seismic strengthening;village communities;quality materials;salvage operations;central authority;procurement method;competitive bidding;local expenditure;feed mill;Cash Income;foreign expenditure;rural construction;physical asset;state farm;university development;emergency program;irrigation works;gas field;scientific equipment;agricultural process;international shopping;prior review;engineering field;civil affairs;village center;detailed planning;village school;economic infrastructure;construction standard;material resource;earthquake conditions;local procurement;damaged buildings;red cross;forest fire;relief effort;agricultural storage;emergency credit;casualty toll;temporary housing;production capabilities;annual revenue;Bank Procedure;investment cost;maintenance expenses;Rural Sector;coal mine;seismic data;loan equity;agricultural area;light industry;freshwater fishery

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - North China Earthquake Reconstruction Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/474961468240896808/China-North-China-Earthquake-Reconstruction-Project