Details
-
Document Date
2011/11/24
-
Document Type
Procurement Plan
-
Report Number
74971
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2013/01/28
-
Disclosure Status
Disclosed
-
Doc Name
China - Zhejiang Qiantang River Basin Small Town Environment Project : procurement plan
-
Keywords
Quality and Cost Based Selection;civil works;water treatment plant;water supply pipe;supply and installation;raw water transmission;intake pipe;water main;water pipe;electrical power;treated effluent;distribution pipeline;pumping station;distribution network;road expansion;storm drainage;pressure pipe;water tank;treatment system;branch road;transmission main;sewerage conveyance;water pipeline;sanitary landfill;leachate treatment;water distribution;storm water;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- DOCX
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
China - Zhejiang Qiantang River Basin Small Town Environment Project : procurement plan (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/478061468219304625/China-Zhejiang-Qiantang-River-Basin-Small-Town-Environment-Project-procurement-plan