Iraq - Emergency Electricity Reconstruction Project : technical annex (English)

The objectives of the project are to: alleviate the current power supply shortfall by restoring the base load generation capacity of the Hartha Power Station Units 2 and 3 to 400 MW; and to lay the groundwork for improved power system planning and fuel supply by providing the tools and other support necessary to enhance in-house capability to prepare, implement and operate current and future projects. This technical annex focuses on the financial and economic benefit of the project by giving specific data on costs, procurement plans, project implementation, project supervision, financial management, environmental and social impacts, and economic analysis.

Details

  • Document Date

    2007/03/06

  • Document Type

    Technical Annex

  • Report Number

    38330

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Iraq,

  • Region

    Middle East and North Africa,

  • Disclosure Date

    2007/04/05

  • Disclosure Status

    Disclosed

  • Doc Name

    Iraq - Emergency Electricity Reconstruction Project : technical annex

  • Keywords

    Environmental and Social Impact Assessment;Environmental and Social Management Plan;transmission and distribution network;legal and regulatory framework;economic and sector work;Cost of Doing Business;Environmental and Social Safeguard;Institutional Development and Capacity;price petroleum product;short period of time;transmission and distribution system;electricity sector;availability of fund;cycle gas turbine;Access to Electricity;power system planning;financial management specialist;infrastructure project finance;supply and installation;Oil and Gas;qualified domestic contractors;procurement post review;Oil & Gas;emission control measure;air quality impact;atmospheric dispersion modeling;adverse health impact;disbursement of fund;short-term consulting;source of financing;defects liability period;natural gas fuel;supply of materials;heavy fuel oil;reconstruction and rehabilitation;power and water;social and environmental;flow of information;government's reform program;incidence of corruption;human development indicator;per capita income;power generation equipment;reliability of supply;Electricity Sector Reform;per capita consumption;repair and maintenance;environmental impact study;quality of supply;financial management arrangement;performance and efficiency;commercial bank account;flow of fund;law and regulation;analysis of alternatives;Financial Management System;financial management requirement;fuel supply;power supply;generating capacity;risk assessment;Advisory services;international community;generation capacity;direct payment;mitigation measure;counterpart fund;electricity system;security situation;financial statement;fund balance;household survey;donor funding;contribution risk;financial counterparts;peak demand;organizational structure;cash basis;iraqi dinar;donor support;sustainable operation;efficient operation;disbursement procedure;national grid;base load;construction supervision;procurement staff;grace period;international waterway;international consultant;load shedding;project costing;fiduciary requirements;daily activity;economic study;environmental safeguard;increased security;competitive bidding;project delays;cycle plant;supply contract;security concern;international compact;project engineer;procurement method;generation plant;technological development;contract management;power utilities;budgetary allocation;overseas training;selection method;environmental matters;support cost;power utility;rehabilitation component;advance procurement;general management;staff salary;incremental cost;administrative procedure;independent audit;alternative financing;tender evaluation;government contribution;financial resource;fiduciary risk;local ngo;fuel quality;financing agreement;filing requirement;notification requirement;field visits;retroactive financing;international banking;funds transfer;ledger account;procurement system;procurement environment;procurement function;regulatory change;prior review;site progress;formal course;local procurement;financial intermediaries;procurement documents;procurement activities;procurement monitoring;reporting system;Centralized Procurement;standard procurement;hands-on training;operational units;operational function;fuel use;power outage;consultancy service;budgetary resource;grant money;financial account;national requirement;evaluation system;professional training;global economy;management assertion;internal control;financial reporting;internal cost;engineering consultant;financial activities;safeguards requirement;operational budget;joint financing;critical infrastructure;technical expertise;domestic labor;commercial operation;production cost;tariff policy;fuel type;electricity tariff;infrastructure reconstruction;donor community;donor financing;professional due;level of support;monitoring compliance;donor agencies;emergency operation;donor coordination;institution building;Social Protection;private investment;manufacturing companies;electricity utilities;electricity policy

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Iraq - Emergency Electricity Reconstruction Project : technical annex (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/484141468285642536/Iraq-Emergency-Electricity-Reconstruction-Project-technical-annex