Details
-
Author
-
Document Date
2015/12/23
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR20696
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2015/12/23
-
Disclosure Status
Disclosed
-
Doc Name
Ghana - Urban Water Project : P056256 - Implementation Status Results Report : Sequence 22
-
Keywords
water supply system;expansion of water supply;people in urban area;piped water supply;delay in procurement;ratio of revenues;household water;performance contract;private operator;local contractor;reform process;project intervention;investment loan;severance program;central regions;urban poor;performance assessment;financial viability;regional operation;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Nkrumah,Emmanuel
Ghana - Urban Water Project : P056256 - Implementation Status Results Report : Sequence 22 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/496941468253795965/Ghana-Urban-Water-Project-P056256-Implementation-Status-Results-Report-Sequence-22