Details
-
Author
-
Document Date
2016/09/26
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR24672
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Mexico - MX Urban Transport Transformation Progr : P107159 - Implementation Status Results Report : Sequence 11
-
Keywords
urban transport;co2 emission;mass transit;Transport and ICT;climate change mitigation;rolling stock;investment loan;fund account;total travel;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Targa Rodriguez,Felipe
Mexico - MX Urban Transport Transformation Progr : P107159 - Implementation Status Results Report : Sequence 11 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/496951474895607111/Mexico-MX-Urban-Transport-Transformation-Progr-P107159-Implementation-Status-Results-Report-Sequence-11