DETAILS
-
2009/06/01
-
Environmental Assessment
-
E533
-
46
-
2009/07/29
-
Disclosed
-
Environmental management plan for Vinh Tuong 110kv substation and connection lines
-
power line
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 378
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Power Engineering Consulting Company (PECC); Power Engineering Consulting Company 4; Power Engineering Consulting Joint Stock Company.
Viet Nam - System Efficiency Improvement, Equitization, and Renewables Project : environmental assessment (Vol. 46 of 46) : Environmental management plan for Vinh Tuong 110kv substation and connection lines (English). s.l. ; s.n.. http://documents.worldbank.org/curated/en/521221468322136210