Skip to Main Navigation

Indonesia - Second Power Transmission Development (English)

Details

  • Author

    IEG Review Team

  • Document Date

    2021/06/29

  • Document Type

    Implementation Completion Report Review

  • Report Number

    ICRR0022494

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Indonesia,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2021/06/29

  • Disclosure Status

    Disclosed

  • Doc Name

    Indonesia - Second Power Transmission Development

  • Keywords

    financial internal rate of return; Economic Internal Rate of Return; Environmental and Social Safeguard; Debt Service Coverage Ratio; electric power supply; indigenous people development plan; transmission and distribution system; worker health and safety; quality of bank supervision; Access to Electricity; theory of change; power transmission network; demand for electricity; amount of electricity; quality at entry; availability of electricity; fast economic growth; electricity demand growth; achievement of outcome; power generation capacity; annual electricity growth; human capital formation; public service obligation; lower electricity demand; agriculture and service; demand for energy; interest during construction; infrastructure project development; Development Policy Lending; misuse of fund; evaluation of bid; bid evaluation process; bid validity period; quality of supervision; changing government priorities; electricity sale; project costing; transmission substations; energy sale; procurement process; substation investment; results framework; transmission capacity; technical feasibility; safeguard policy; Safeguard Policies; outcome targets; tariff change; electricity tariff; intermediate outcome; Indigenous Peoples; operational efficiency; advance payment; land acquisition; contract management; transmission investment; strategic objective; government priority; kv substation; reporting system; power capacity; outcome indicator; eligibility criterion; transmission bottleneck; furnace oil; electromagnetic field; weighted average; electrical appliance; primary reason; industrial sector; sustainable operation; involuntary resettlement; technological advancement; budget approval; financial covenant; contract signing; lower achievement; electricity grid; result indicator; available evidence; industrial consumer; entry rate; large population; capital expenditure; financial situation; financial capability; risk assessment; transmission system; organizational deficiencies; operational inefficiency; mitigation measure; financial analysis; bureaucratic process; internal process; procurement issue; power engineer; various contract; proxy indicator; transmission infrastructure; supply cost; construction work; first year; alternative financing; increased investment; Energy Sector; increasing investment; pump storage; partnership framework; sustainable energy; distribution network; procurement rule; national grid; expansion plan; least cost; investment lending; grid capacity; technical standard; reasons given; causal chain; power company; geothermal resource; load shedding; new connections; project datum; price contingency; front-end fee

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

IEG Review Team

Indonesia - Second Power Transmission Development (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/521251624948423584/Indonesia-Second-Power-Transmission-Development