Details
-
Author
-
Document Date
2013/03/27
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR9578
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Nigeria - Rural Access and Mobility Project (RAMP) : P072644 - Implementation Status Results Report : Sequence 10
-
Keywords
river crossing;rolling plan;road management system;kilometers of road;construction and rehabilitation;state road;rural population;heavy rain;trips per day;agricultural produce;financial agreement;inventory system;road map;prepare budget;accessibility index;area population;construction method;construction work;dry season;rehabilitation contracts;civil works;rural community;road access;gravel road;road link;adequate funds;transport cost;good road;Fuel Subsidies;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Ahmed,Olatunji
Nigeria - Rural Access and Mobility Project (RAMP) : P072644 - Implementation Status Results Report : Sequence 10 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/526391468292916309/Nigeria-Rural-Access-and-Mobility-Project-RAMP-P072644-Implementation-Status-Results-Report-Sequence-10