Details
-
Author
-
Document Date
2015/09/04
-
Document Type
Project Information Document
-
Report Number
PIDA29639
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Project Information Document (Appraisal Stage) - Bangladesh Ghorashal Unit 4 Repowering Project - P128012
-
Keywords
Electricity;Energy Efficiency in Heat and Power;liquid fuel;dual fuel power plant;power purchase agreement;Access to Electricity;per capita income;gross domestic product;Thermal Power Generation;electricity generation company;generation capacity;availability of gas;natural gas reserves;energy specialist;private power;primarily due;efficient power plant;large power plant;transmission and distribution;local natural disaster;rural electric cooperative;base load power;per capita consumption;annual budgetary transfer;natural gas production;load shedding;installed capacity;power sector reform;power shortage;gas transmission network;gas transmission system;exploration work;power distribution company;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Anis,Mohammad
Project Information Document (Appraisal Stage) - Bangladesh Ghorashal Unit 4 Repowering Project - P128012 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/526581468014375388/Project-Information-Document-Appraisal-Stage-Bangladesh-Ghorashal-Unit-4-Repowering-Project-P128012