Skip to Main Navigation

China - JiTuHun Railway Project (English)

Details

  • Document Date

    2011/02/15

  • Document Type

    Integrated Safeguards Data Sheet

  • Report Number

    AC5715

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2011/04/13

  • Disclosure Status

    Disclosed

  • Doc Name

    China - JiTuHun Railway Project

  • Keywords

    Public Expenditure, Financial Management and Procurement;Environmental and Social Impact;drinking water protection area;Environmental and Social Safeguard;Land Acquisition and Resettlement;scheme will;physical cultural resources;access road;social security program;single track railway;potential tiger habitats;soil erosion control;fragmentation of habitat;development of railway;loss of vegetation;construction and operation;social and environmental;frequency of service;level of support;rural road network;passenger journey time;adverse social impact;environmental management framework;analysis of alternatives;pest management practice;protected area;indirect impact;public consultation;mitigation measure;urban resettlement;biodiversity study;engineering design;indigenous people;high sensitivity;ecological perspective;natural habitat;Indigenous Peoples;ecological impact;Social Assessment;mountainous region;management authority;construction management;railway alignment;railway line;freight train;Ethnic Minorities;nature reserve;land take;railway construction;railway station;disposal site;water resource;resettlement activities;resettlement cost;rural resettlement;compensation rate;rail network;rail station;resettlement impacts;station location;disposal area;cultural relic;international waterway;accessible location;affected persons;compensation measures;forested areas;involuntary resettlement;project datum;protection zone;site selection;environmental design;approval procedure;social disturbance;Urban Planning;rural production;investment loan;land use;transport demand;maximum extent;environmental practice;Waste Management;construction site;Temporary Work;construction stage;sensitive ecosystems;forest reserve;environmental sites;baseline survey;international border;construction practices;environmental degradation;national highway;alluvial plain;passenger train;vegetation cover;dense water;qualified consultant;Bank Policies;critical habitat;informal meeting;local traffic;information dissemination;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - JiTuHun Railway Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/528261468219886965/China-JiTuHun-Railway-Project