Details
-
Document Date
2007/12/10
-
Document Type
Integrated Safeguards Data Sheet
-
Report Number
AC2854
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2007/12/11
-
Disclosure Status
Disclosed
-
Doc Name
Tanzania - Second Central Transport Corridor Project
-
Keywords
Environmental and Social Impact;Export Development and Competitiveness;green house gas emission;preparation of bidding documents;Regulation and Competition Policy;environmental and social management;Occupational health and safety;loss of employment;Safeguard Policies;safeguard policy;vehicle operating cost;trunk road network;public utility service;public transport service;general transportation sector;roads and highway;soil erosion control;road safety measure;incidence of hiv;land use;adjacent land use;community at large;loss of vegetation;river bank erosion;air traffic noise;bicycle parking facility;response to crisis;surface water source;road safety audit;safety of dam;public entity;bus stop;commercial activity;urban transport;involuntary resettlement;heavy machinery;construction material;Road Accidents;long-term impact;bus depot;road standard;local ngo;emission standard;positive impact;bridge deck;project costing;average distance;road section;passenger traffic;runway rehabilitation;transport facility;institutional responsibilities;project datum;parking space;noise level;public place;resettlement plan;gravel surface;city beautification;diesel engine;HQ Offices;river bed;public meeting;heavy gas;assessment exercise;asphalt concrete;indigenous people;Indigenous Peoples;local papers;rumble strip;drainage pattern;water flow;construction phase;community level;pedestrian crossing;safeguard issue;Urban Planning;transportation planning;local expert;safeguard analysis;airport security;vibration level;tourist destination;construction risk;trade center;aircraft movement;waste production;irreversible impacts;human settlement;international waterway;physical characteristic;disease vector;water pollution;security fence;construction equipment;express service;project finance;cultural property;drainage structure;media coverage;safety reason;automatic transfer;natural habitat;skill need;urgent rehabilitation;extensive consultation;rush hour;vehicle speed;speed reduction;sustainable urban;satisfactory rating;adequate security;adequate capacity;representative sample;consultation process;investment loan;abandoned pit;contract duration;bus station;Public-Private Partnership;infrastructure service;market access;preferential access;bank restructuring;bus operator;mitigation measure;construction camp;security concern;airport fencing;contract agreement;Waste Material;road pavement;income restoration;earth fill;operational issues;breeding site;monitoring indicator;liquid waste;bus operating;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Tanzania - Second Central Transport Corridor Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/534841468117291022/Tanzania-Second-Central-Transport-Corridor-Project