Details
-
Author
IEG Review Team
-
Document Date
2021/06/25
-
Document Type
Implementation Completion Report Review
-
Report Number
ICRR0022393
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/06/25
-
Disclosure Status
Disclosed
-
Doc Name
Albania - Water Sector Investment Project
-
Keywords
Wastewater Collection and Transportation; investment in water supply; quality of water supply; bulk water supply system; economic and financial analysis; water and sewerage service; operation and maintenance cost; Internal rate of return; coastal city; quality of drinking water; wastewater treatment plant; hours of water; theory of change; water service delivery; public awareness campaign; water and wastewater; financial working ratio; drinking water quality; volume of water; water demand management; number of beneficiaries; water service interruption; leak detection equipment; bulk water transmission; quality of wastewater; water supply investment; storm water system; displacement of people; improved water quality; detailed engineering design; local government capacity; national government agency; exchange rate loss; availability of water; water quality standard; water supply network; constraints to growth; cost of capital; water supply sector; access to collection; physical water losses; collection of wastewater; investments in infrastructure; secure financing; currency exchange rate; financial management specialist; water supply production; wastewater service; results framework; intermediate outcome; project costing; water production; outcome indicator; sewerage network; distribution network; social safeguard; construction permit; output level; Water Services; cleaning equipment; electricity cost; water utility; water utilities; illegal connection; water consumption; high power; beach area; secondary distribution; proxy indicator; household water; procurement capacity; project intervention; result indicator; energy cost; procurement delay; staff turnover; elevated reservoir; water conservation; operational efficiency; pipeline route; sewer network; budget allocation; network efficiency; Sanitation Services; wastewater effluent; cost benefit; wastewater investment; managerial capacity; land acquisition; production wells; heavy rain; outcome targets; utility model; transmission line; physical losses; beneficiary survey; corrective measure; water reservoir; financial reporting; accession rule; financial software; network monitoring; sewer blockage; data gaps; operational staff; flow meter; untreated sewage; sewerage system; project operation; target beneficiary; dry weather; institutional procedures; fiduciary risk; urban wastewater; work contracts; procurement documents; target setting; new connections; train activity; procurement function; direct beneficiaries; independent audit; transparency issues; government risk; government's commitment; sanitation policy; water theft; natural hazard; financial viability; entire investment; institutional change; capacity constraint; mitigation efforts; water distribution; delay in procurement; pipeline transmission; physical achievement; entry rate; beach pollution; socio-economic status; baseline data; irreversible impacts; stated objective; Environmental Assessment; water tariff; tariff increase; monitoring function; project finance; rural area; legislative change; installment plan; old debt; tariff level; regulatory authority; financial cost; national budget; safeguards compliance; benefit analysis; social network; financial rate; riparian country; construction phase; project approval; financial sustainability; household connection; protected area; supply capacity; causal chain; urban population; urgent rehabilitation; rural resident; disaster resilience; piped water; Water Shortage; network investment; efficient billing; population increase; tourist season; quality water; pumping station; financial efficiency; service coverage; affordable water; cost control; water directive; water resource; water connection; Consulting services; financial audits; price contingency; front-end fee; rural community; rehabilitation activities; Exchange Rates; project datum; financing cost
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
IEG Review Team
Albania - Water Sector Investment Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/537141624635199211/Albania-Water-Sector-Investment-Project