Skip to Main Navigation

The ratings for the project were as follows: the outcome was satisfactory, the sustainability was likely, the institutional development impact was modest, and the Bank and borrower performance were both satisfactory,. The lessons learned indicate that funding requirements of such large projects need to be more formally committed than was the case for Ghazi Barotha Hydropower Project (GBHP). The environmental aspects of GBHP are mainly positive...
See More

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Pakistan - Ghazi Barotha Hydropower Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/539771468774911654/Pakistan-Ghazi-Barotha-Hydropower-Project

This document is being processed or is not available.