Skip to Main Navigation

Vietnam - Additional Financing for the Second Transmission and Distribution Project : environmental assessment (Vol. 6) : Environmental management plan for Thap Cham 220 kV substation and connecting branches (English)

This environmental management plan of the Additional Financing for the Second Transmission and Distribution Project for Vietnam identifies potential environmental risks and proposes measures to mitigate them. Negative measures include: identified risks derive from plane clearance, building an access road from the highway to the substation, air pollution from vehicle exhaust, uncovered vehicles transporting dusty materials, construction noise, electrical and electromagnetic transmission, wastewater, risk of fire and explosion, and solid waste. Mitigation measures include: i) damping down dust and covering vehicles; ii) providing compensation for asset loss; iii) ensuring that vehicles have internal combustion engines and operating licenses; iv) scheduling construction, notifying locals if construction is needed at night; v) ensuring electrical equipment complies with national or international standards; vi) treating wastewater; vii) installing fire prevention equipment; viii) installing drainage systems; and ix) collecting and transporting water to city disposal sites.

Details

  • Document Date

    2010/09/27

  • Document Type

    Environmental Assessment

  • Report Number

    E2282

  • Volume No

    6

  • Total Volume(s)

    10 (See all volumes)

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/11/03

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental management plan for Thap Cham 220 kV substation and connecting branches

  • Keywords

    water supply and drainage;monitoring plan;joint stock company;mitigation measure;impact on health;construction and operation;environmental impact mitigation;disposal of waste;access road construction;impact of mine;number of workers;safety of worker;forest fire prevention;consumption of wildlife;hazardous waste treatment;surface water source;transmission line;construction phase;construction time;construction process;land area;residential area;vegetation cover;construction activities;environmental monitoring;domestic sewage;electromagnetic field;power network;project construction;septic tank;foundation construction;public consultation;distribution line;natural forest;crop land;soil erosion;road foundation;construction area;fruit tree;water pump;investment capital;sanitation work;railway signal;oil tank;fire fight;project operation;earth system;crossing over;institutional activity;monitoring activity;monitoring cost;bare land;agricultural land;lost land;cost engineering;oil leakage;information dissemination;clearance process;concrete maintenance;safety regulation;rainy season;construction site;environmental matters;cost decrease;local waste;kv substation;noise level;field intensity;average distance;transmission phase;resettlement policy;monitoring equipment;construction soil;construction plant;highway construction;construction impact;construction cost;safety condition;protective clothing;telecommunication line;cost allowance;resettlement compensation;resettlement resettlement;construction waste;environment pollution;Environmental Safety;mechanical equipment;domestic waste;respiratory illness;crop damage;road system;cable line;specialized agency;safety belt;natural environment;worker health;environment monitoring;ground level;spark gaps;land acquisition;waste collection;meeting minutes;dust emission;contract cost;construction material;investment cost;historical heritage;power supply;damage assessment;railway operation;maintenance workers;water erosion;soil surface;management method;rainy days;concrete mixture;civil works;construction contractor;equipment maintenance;working time;reporting system;construction schedule;main road;water supplying;rain water;traffic density;suspended solid;equipment cost;g 10;crop plant;flood season;optical cable;drainage system;ditch system;steel pipe;cable system;wire system;reinforced concrete;oil storage;forest land;water tank;administrative staff;circuit breaker;fire alarm;emission source;wildlife product;flat topography;exhaust emission;dry season;unused land;air environment;soil excavation;construction equipment;water environment;coordinate system;transmission corporation;carbon dioxide;wild animal;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Vietnam - Additional Financing for the Second Transmission and Distribution Project : environmental assessment (Vol. 6) : Environmental management plan for Thap Cham 220 kV substation and connecting branches (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/539911468172448268/Environmental-management-plan-for-Thap-Cham-220-kV-substation-and-connecting-branches