Gambia - Electricity Support Project (English)

Ratings of Electricity Support Project for The Gambia were as follows: outcome was satisfactory, Bank performance was highly satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: (i) An effective structure needs to be established to ensure that National Water and Electricity Company (NAWEC) conducts regular maintenance of its generating assets; (ii) Establish an effective sludge management system; (iii) Developing strong Occupational Health and Safety (OHS) practices; (iv) A functional grievance redress mechanism (GRM) at an institutional level is essential to ensure adverse project impacts can be addressed; (v) Keep it simple and flexible; (vi) Project Implementation Unit (PIU) staff should be dedicated to the project to ensure timely project implementation; and (vii) Strengthening assistance and building capacity in the areas of procurement and E&S safeguards in an fragile conflict and violence (FCV) environments are a key ingredient to ensure a successful implementation.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Gambia - Electricity Support Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/541441601923658642/Gambia-Electricity-Support-Project