Ratings of Electricity Support Project for The Gambia were as follows: outcome was satisfactory, Bank performance was highly satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: (i) An effective structure needs to be established to ensure that National Water and Electricity Company (NAWEC) conducts regular maintenance of its generating assets; (ii) Establish an effective sludge management system; (iii) Developing strong Occupational Health and Safety (OHS) practices; (iv) A functional grievance redress mechanism (GRM) at an institutional level is essential to ensure adverse project impacts can be addressed; (v) Keep it simple and flexible; (vi) Project Implementation Unit (PIU) staff should be dedicated to the project to ensure timely project implementation; and (vii) Strengthening assistance and building capacity in the areas of procurement and E&S safeguards in an fragile conflict and violence (FCV) environments are a key ingredient to ensure a successful implementation.
Details
-
Document Date
2020/09/29
-
Document Type
Implementation Completion and Results Report
-
Report Number
ICR5035
-
Volume No
1
-
Total Volume(s)
1
-
Country
Gambia, The
-
Region
-
Disclosure Date
2020/10/05
-
Disclosure Status
Disclosed
-
Doc Name
Gambia - Electricity Support Project
-
Keywords
Environmental and Social Impact Assessment; state-owned enterprise; Environmental and Social Management Plan; islamic development bank; Urban Infrastructure and Service Delivery; economic and financial analysis; resettlement action plan; investment need; Risks and Mitigation Measures; average cost of supply; absolute numbers of people; delivery of energy service; Environmental and Social Safeguard; Urban and Rural Development; Energy Transmission and Distribution; Natural Resource Management; transmission and distribution network
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Gambia - Electricity Support Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/541441601923658642/Gambia-Electricity-Support-Project