Details
-
Author
IEG Review Team
-
Document Date
2019/01/24
-
Document Type
Implementation Completion Report Review
-
Report Number
ICRR0021373
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2019/01/24
-
Disclosure Status
Disclosed
-
Doc Name
Guinea-Bissau - GW- Emergency Electricity Water Rehab.
-
Keywords
Electricity and Water Utility; World Bank Group Strategy; Risks and Mitigation Measures; improvement of water supply; access to water supply; access to safe water; reliability of water supply; economic and financial analysis; Internal rate of return; water supply service; electricity supply service; water distribution network; power generation capacity; maintenance and repair; supply and installation; sustainability of development; water storage capacity; power and water; electricity generation capacity; Rule of Law; water and electricity; social and environmental; heavy fuel oil; amount of electricity; supply consumer; consumption of fuel; theory of change; exchange rate change; net present value; supply of electricity; number of water; net economic benefit; provision of service; insufficient institutional capacity; environmental safeguard policy; misuse of fund; asbestos cement pipes; average daily consumption; water service interruption; amount due; rehabilitation of electricity; financial viability; military coup; project costing; Fragile Countries; prepayment meter
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
IEG Review Team
Guinea-Bissau - GW- Emergency Electricity Water Rehab. (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/564601548364899672/Guinea-Bissau-GW-Emergency-Electricity-Water-Rehab