Skip to Main Navigation

Tanzania - Second Central Transport Corridor Project : P103633 - Implementation Status Results Report : Sequence 11 (English)

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Mchomvu,Yonas Eliesikia

Tanzania - Second Central Transport Corridor Project : P103633 - Implementation Status Results Report : Sequence 11 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/575361468119345815/Tanzania-Second-Central-Transport-Corridor-Project-P103633-Implementation-Status-Results-Report-Sequence-11