Details
-
Author
-
Document Date
2014/02/04
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR13355
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Tanzania - Second Central Transport Corridor Project : P103633 - Implementation Status Results Report : Sequence 11
-
Keywords
satisfactory rating;rush hour;contractual issue;resettlement action plan;project affected persons;vehicle operating cost;defects liability period;public transport passenger;work contracts;security standard;financial agreement;transport study;transport facility;month contract;road work;power utilities;power utility;bus station;compensation fund;sale agreement;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Mchomvu,Yonas Eliesikia
Tanzania - Second Central Transport Corridor Project : P103633 - Implementation Status Results Report : Sequence 11 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/575361468119345815/Tanzania-Second-Central-Transport-Corridor-Project-P103633-Implementation-Status-Results-Report-Sequence-11