China - Liaoning Environmental Project : environmental assessment (Vol. 12) : Environmental assessment report for low concentration SO improvement project of Benxi power plant (English)

The World Bank Liaoning Environment Project II (LEPII) consists of a number of individual subprojects to improve environmental quality in the province. The projects proposed and summarized in this summary environmental assessment report will improve surface and groundwater quality and air quality, and will enhance the water supply for potable and industrial use. The LEPII consists of the following components: 1) city of Anshan wastewater treatment and recovery; 2) city of Benxi wastewater treatment; 3) city of Fushun wastewater treatment; 4) smoke-dust control at the BISC no. 1, 2, and 4 coke ovens; 5) dry electrostatic precipitor installation at the BISC no. 1 and no. 2 blast furnaces; 6) transmission pipeline and heat exchange stations for the Benxi central heating system; 7) city of Dalian Malan River wastewater treatment plant and Chunliu wastewater treatment plant improvement; 8) city of Dalian waste project; and 9) city of Jinzhou water supply/Jincheng Paper Mill water pollution abatement.

Details

  • Author

    Ecology and Environment Inc.

  • Document Date

    1993/09/30

  • Document Type

    Environmental Assessment

  • Report Number

    E40

  • Volume No

    12

  • Total Volume(s)

    12 (See all volumes)

  • Country

    China,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2010/07/01

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental assessment report for low concentration SO improvement project of Benxi power plant

  • Keywords

    Lime;policy for environmental protection;sulphur content in coal;social and economic development;coal consumption;daily average;slaked lime;annual operation;exhaust fan;dust collector;adsorption tower;hot water supply;short term impact;environmental protection engineering;high sulphur content;environmental protection plan;environmental quality monitoring;construction and operation;spray dry;pollution source;construction work;project construction;waste discharge;annual discharge;environmental pollution;coal burn;industrial production;air flow;industrial value;power supply;mountain area;chemical reaction;sound insulation;public attitude;acceptable degree;raw material;environmental monitoring;welfare fund;public support;environmental benefit;labor productivity;medical treatment;local resident;wind direction;River basin;transfer machine;feeding system;transfer pump;storage tank;price contingency;lime powder;green plant;public health;crop harvest;environment quality;dust removal;air monitoring;environment pollution;gas phase;environmental accident;dust content;air temperature;wind speed;ground level;monitoring plan;monitoring frequency;primary class;acid rain;routine maintenance;geographical position;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Ecology and Environment Inc.

China - Liaoning Environmental Project : environmental assessment (Vol. 12) : Environmental assessment report for low concentration SO improvement project of Benxi power plant (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/598511468240586062/Environmental-assessment-report-for-low-concentration-SO-improvement-project-of-Benxi-power-plant