Vietnam - Rural Distribution Project : resettlement plan (Vol. 10) : Rural distribution subproject : Binh Dinh Province (English)

The development objective of the Rural Distribution Project for Vietnam focuses on rehabilitating and increasing the capacity of existing distribution lines and substations and standardizing them to enable them to meet the growing demand more efficiently, provide better quality and quantity of electric power for productive uses, and reduce power system losses. The resettlement plan (RP) evaluated the impact on project affected peoples (PAPs). In this regard, the following mitigation measures will be applied : acquisition of land and other assets, and resettlement of people will be minimized as much as possible; all PAPs residing, working, doing business, or cultivating land in the right of way (ROW) of transmission lines, surrounding areas of tower foundations, substation areas, or service roads will be provided with rehabilitation measures to assist them to improve or at least maintain their pre-project living standards, income earning capacity, and production levels; displaced peoples (DPs) raising complaints and grievances will be treated fairly and guided by the related agencies with procedures and formalities for lodging their complaints; the previous level of community services and resources will be maintained or improved; and finally, supervision, monitoring, and evaluation of the RP implementation will be carried out effectively and timely.

Details

  • Author

    No. 1 Power Construction Consultancy Co. Ltd., PC2 Power Engineering and Consulting Center

  • Document Date

    2007/10/01

  • Document Type

    Resettlement Plan

  • Report Number

    RP606

  • Volume No

    10

  • Total Volume(s)

    67 (See all volumes)

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2007/11/20

  • Disclosure Status

    Disclosed

  • Doc Name

    Rural distribution subproject : Binh Dinh Province

  • Keywords

    power transmission system;Land Acquisition and Resettlement;power engineering;law and regulation;replacement cost;compensation at replacement;resettlement and rehabilitation;unit price;land use plan;land use right;income earning capacity;Electricity of Vietnam;quality and quantity;agriculture and forestry;compensation for land;valuation of losses;acquisition of land;cost materials;compensation for loss;standard of living;public information campaign;participation in planning;agricultural extension service;infrastructure and services;loss of income;resettlement of people;annual inflation rate;health care service;legal right;external monitoring;socio-economic survey;baseline information;rural distribution;power supply;project impact;land clearance;market cost;living standard;civil works;market price;distribution line;rehabilitation activities;impact survey;entitlements policy;community meetings;eligibility criterion;land price;productive land;residential land;transmission line;replacement value;medium voltage;legal framework;transition period;power system;efficiency improvement;industrial sector;kv line;resettlement assistance;rural area;access road;construction period;social safeguard;Land Registration;agricultural land;work shift;involuntary resettlement;acceptable quality;productive use;Electric Power;positive outcome;project construction;resettlement plan;regulation concern;baseline survey;monitoring agency;Fixed Assets;public consultation;mitigation measure;organizational structure;domestic law;vulnerable group;impact categories;diacritic marks;productive asset;data management;exchange rate;Exchange Rates;production level;Funding agencies;income support;salvage material;food production;housing condition;construction specification;district hospital;survey household;district town;process industry;natural forest;power network;financial proposal;management cost;counterpart fund;data gathering;legal fee;government investment;public place;Community Services;effective participation;road crossing;Land tenure;productive capacity;physical resources;qualified consultant;restoration program;internal monitoring;information dissemination;public road;public meeting;subsistence allowance;compensation payment;cash compensation;transfer tax;displaced person;national assembly;land right;government decree;state budget;market economy;vietnamese dong;productive force;rural policy;farm town;small industry;aquaculture development;remote area;fishery sector;technical standard;tax receipt;baseline data;financial resource;institutional framework;socioeconomic survey;grievance procedure;city government;Crop;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

No. 1 Power Construction Consultancy Co. Ltd. PC2 Power Engineering and Consulting Center

Vietnam - Rural Distribution Project : resettlement plan (Vol. 10) : Rural distribution subproject : Binh Dinh Province (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/604411468317344448/Rural-distribution-subproject-Binh-Dinh-Province