Skip to Main Navigation

Venezuela - Guri Powerhouse Extension Project (English)

As already mentioned, the first stage of Guri with its three units is nearing completion. The project now proposed for Bank financing would include civil works to extend the powerhouse to ten units, and the installation of unit 4 complete and of embedded parts for units 5 to 10. It would also provide for consulting services for engineering and supervision during procurement and construction. The basic powerhouse construction would be completed during 1969-72. Unit 4, the first in the expansion program, would come into service in 1973; the remaining six units would be erected one each year commencing in 1975. The resulting power capacity would meet the market forcast for Guri through 1980.

Details

  • Document Date

    1969/06/30

  • Document Type

    Staff Appraisal Report

  • Report Number

    PU6

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Venezuela, Republica Bolivariana de

  • Region

    Latin America & Caribbean,

  • Disclosure Date

    2010/06/18

  • Disclosure Status

    Disclosed

  • Doc Name

    Venezuela - Guri Powerhouse Extension Project

  • Keywords

    foreign exchange;civil works;Internal rate of return;cubic meters per second;frequency conversion;general contractor;financing plan;market area;transmission system;Financing plans;market development;revenue from sales;concrete gravity dam;foreign currency exchange;shortage of funds;tariff structure;costs of conversion;regular contract;water supply system;per capita gnp;gas turbine plant;debt limitation covenant;settlement of claim;amount of power;interest charge;industrial operation;hydroelectric plant;present value;sale agreement;bank finance;construction period;performance criteria;municipal system;interconnection agreement;financial aspect;cash dividend;special provision;generating capacity;bulk power;discount rate;industrial center;electro-mechanical equipment;petroleum sector;investment fund;average revenue;cycle system;federal budget;central system;long-term rate;private company;loan account;total currency;supply capacity;refinery operation;competitive basis;private power;voltage transmission;market growth;construction cost;debt service;system requirement;industrial company;performance bond;price waterhouse;sunk cost;financial resource;commercial operation;principal factor;government enterprise;production increase;transmission facility;fuel replacement;subsidiary company;long-term growth;average sales;iron smelters;Power Generation;Electric Power;promotional activity;urban development;wholesale power;civil engineering;power system;rolling mill;conversion facility;steel production;market center;loan fund;retained earnings;government investment;contingency allowance;large reservoir;dependable power;bank assistance;unit price;river bed;thermal plant;power facility;load growth;central market;water-supply system;basic metal;electrical appliance;construction material;public power;international competition;federal level;central regions;iron ore;hydroelectric potential;Natural Resources;market condition;future payment;engineering study;final disposition;financial arrangement;generating plant;rural area;electric service;construction programs;legislative measure;daily operation;delivery period;annual payment;price advantage;reasonable time;transmission loss;financial projection;population estimate;market price;industrial zone;power agreement;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Venezuela - Guri Powerhouse Extension Project (English). Public utilities projects ; no. PU 6 Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/606571468315005070/Venezuela-Guri-Powerhouse-Extension-Project