Details
-
Author
-
Document Date
2020/06/25
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR40550
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/06/25
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Lao Road Sector Project 2 (LRSP2) - P158504 - Sequence No : 07
-
Keywords
implementation of road work; Public Works and Transport; On the Job Training; road safety audit; length of road; share of woman; performance based contract; routine maintenance; Investment Project Financing; road maintenance activity; road safety strategy; still under implementation; institutional strengthening; road improvement; climate resilience; district road; road condition; rolling plan; natural hazard; rural population; emergency response; award process; risk category; operation risk; audit training; contract management; payment process; road contracts; labour force; local contractor; travel restriction; Traffic Safety
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Southivong,Sombath
Disclosable Version of the ISR - Lao Road Sector Project 2 (LRSP2) - P158504 - Sequence No : 07 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/610981593078199649/Disclosable-Version-of-the-ISR-Lao-Road-Sector-Project-2-LRSP2-P158504-Sequence-No-07