The objective of the Additional Financing for the Community and Social Development Project for Nigeria is to increase access by the poor to improved social and natural resources infrastructure services in a sustainable manner throughout Nigeria. Some of the negative impacts include: (i) waste generation and poor disposal including human faeces and urine; (ii) outbreak of diseases due to congestion and poor hygiene; (iii) traffic flow obstruction and risk of accident; and (iv) escalation of threat to insecurity due to exposure of the school premises to trespassers. Some of the mitigation measures include: (a) develop detailed specific mitigation measures with relevant costs implication that will need to be achieved during and after sub-project implementation; (b) specify responsibilities and institutional arrangement that will be put in place to ensure that the mitigation measures are implemented; (c) providing detailed design criteria for specific mitigation measures to be implemented; (d) tracking to ensure the effectiveness of the mitigation measures at meeting the discharge standards; (e) integrating environment fully into the various activities of the proposed project and ensuring inclusion of environmental requirements into tender documents, continuing management and evaluation of the environmental performance of the project; and (f) provide implementation and monitoring schedule.
Details
-
Author
-
Document Date
2016/05/01
-
Document Type
Environmental Assessment
-
Report Number
SFG2188
-
Volume No
12
-
Total Volume(s)
-
Country
-
Region
-
Disclosure Date
2016/05/18
-
Disclosure Status
Disclosed
-
Doc Name
Environmental and social management plan for construction of motorized boreholes at Wade community in Deba Lga of Gombe state
-
Keywords
Environmental and Social Impact;mitigation measure;water borne disease;sanitation and hygiene;Occupational health and safety;poor water quality;incidence of malaria;sectoral ministries;household and individual;access of poor;displacement of persons;construction activities;water logging;hand pump;social checklist;water wastage;buying water;waste water;beneficial impact;Waste Management;traffic condition;consultancy service;pedestrian bridge;soil characteristic;site inspection;monitoring arrangement;mosquito vector;Safeguard Policies;construction stage;credit agreement;institutional measure;environmental requirement;environmental performance;discharge standard;water resource;animal resource;safeguard policy;trading activity;living condition;community group;investment component;vulnerable group;public good;investment grant;Public Goods;building component;vulnerable communities;Natural Resources;occupational hazard;construction work;surface water;infrastructure service;water harvesting;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- DOCX
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Koleva,Antonia T.
Nigeria - Community and Social Development Project : additional financing : environmental assessment (Vol. 12) : Environmental and social management plan for construction of motorized boreholes at Wade community in Deba Lga of Gombe state (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/611181468323657182/Environmental-and-social-management-plan-for-construction-of-motorized-boreholes-at-Wade-community-in-Deba-Lga-of-Gombe-state