The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures include: a) all vehicles and equipment should be monitored and maintained in good working order; b) all sirens should have appropriate directional and volume settings; c) maintenance of vehicles should only be carried out in designated areas within towns or in the construction camp; d) materials capable of resulting in poor quality leachates will not be used for the construction of roads or other infrastructure; e) number and extent of borrow pits should be kept to the minimum possible for the economic supply of construction materials; f) roads should be constructed with calcrete or laterite, which will maintain its form for longer; g) to preserve as much of the animals' habitats as possible; and h) to prevent the loss of a viable seed bank in the stockpiled topsoil.
Details
-
Document Date
2007/11/01
-
Document Type
Board Report
-
Report Number
48448
-
Volume No
3
-
Total Volume(s)
3
-
Country
-
Region
-
Disclosure Date
2009/11/11
-
Disclosure Status
Disclosed
-
Doc Name
Executive summary
-
Keywords
power station;ground level;noise level;stack height;conventional thermal power plant;delivery of health services;daily average;greenhouse gas emission inventory;ambient air quality;Electricity;ambient noise level;power line;noise impact;study area;electricity generation technology;emission per person;air quality impact;power plant site;base-load electricity generation;demand for electricity;noise impact assessment;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Botswana - Morupule B Generation and Transmission Project (Vol. 3) : Executive summary (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/612731468199154467/Executive-summary