Skip to Main Navigation

Bhutan - Second Urban Development Project (BUDP2) : Implementation support mission - July 18 to 27, 2016 (English)

Details

  • Author

    Chen,Michelle Lisa

  • Document Date

    2016/07/27

  • Document Type

    Aide Memoire

  • Report Number

    108567

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Bhutan,

  • Region

    South Asia,

  • Disclosure Date

    2016/09/29

  • Disclosure Status

    Disclosed

  • Doc Name

    Bhutan - Second Urban Development Project (BUDP2) : Implementation support mission - July 18 to 27, 2016

  • Keywords

    civil works;transmission main;Occupational health and safety;water quality test result;health and safety issue;Senior Financial Management Specialist;social safeguard;central water supply;water treatment plant;audit review;call for bids;urban local government;social and environmental;award of contract;pipe laying;ease of operation;fiscal transfer system;water quality analysis;senior procurement specialist;sewerage treatment plant;property tax system;Financial Management System;wireless access point;expenditure management system;capacity building program;water supply engineer;Environmental Management Plan;water demand projection;Social Impact Assessment;wastewater treatment plant;population growth rate;description of item;asset register;safeguard study;equipment purchase;water main;award recommendation;construction supervision;budget allocation;credit closing;learning centre;spatial planning;Municipal Finance;coordination committee;acceptable quality;field visits;physical work;mutual agreement;buffer zone;longitudinal survey;peak demand;competent authority;contract amount;raw water;affected persons;contract duration;river gauging;Waste Management;retaining wall;road work;local situation;construction site;prior review;sewerage system;fire hydrant;data management;development training;gravity flow;train activity;municipal reform;management skill;contract completion;base year;consultative meeting;retaining structure;course participant;satisfactory progress;contract management;crash barrier;road sign;procurement method;sustainable policy;monsoon season;sewerage connection;piped water;bank draft;primary road;pipeline installation;local revenue;urban planner;tax records;concrete work;dry weather;road marking;road length;management improvement;business process;environmental specialist;sole source;cable laying;street light;urban service;month contract;intermediate indicator;heavy duty;professional service;sewerage network;capacities in support;social aspect;institutional system;Tax Administration;water pipeline;legal representative;national population;credit allocation;budget amount;financial statement;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Chen,Michelle Lisa

Bhutan - Second Urban Development Project (BUDP2) : Implementation support mission - July 18 to 27, 2016 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/615181475140601642/Bhutan-Second-Urban-Development-Project-BUDP2-Implementation-support-mission-July-18-to-27-2016