Skip to Main Navigation

Africa - AFCC2/RI-3A-Southern Afr Power Mrkt APL 1 (FY04) : P069258 - Implementation Status Results Report : Sequence 26 (English)

Details

  • Author

    Luengo,Manuel

  • Document Date

    2016/09/30

  • Document Type

    Implementation Status and Results Report

  • Report Number

    ISR25142

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Africa,

  • Region

    Africa,

  • Doc Name

    Africa - AFCC2/RI-3A-Southern Afr Power Mrkt APL 1 (FY04) : P069258 - Implementation Status Results Report : Sequence 26

  • Keywords

    Loan to Turkey;tie line;transmission line;high voltage transmission;number of classrooms;number of water;adaptable program loan;regional economic integration;regional power market;transmission system;power transfer;electricity connection;fiduciary capacity;installed capacity;aids campaign;transmission connection;economic competitiveness;power station;transmission capacity;primary level;direct beneficiaries;health facility;mining industry;social infrastructure;energy shortage;domestic demand;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Luengo,Manuel

Africa - AFCC2/RI-3A-Southern Afr Power Mrkt APL 1 (FY04) : P069258 - Implementation Status Results Report : Sequence 26 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/616891475264055815/Africa-AFCC2-RI-3A-Southern-Afr-Power-Mrkt-APL-1-FY04-P069258-Implementation-Status-Results-Report-Sequence-26