Details
-
Author
-
Document Date
2016/09/30
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR25142
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Africa - AFCC2/RI-3A-Southern Afr Power Mrkt APL 1 (FY04) : P069258 - Implementation Status Results Report : Sequence 26
-
Keywords
Loan to Turkey;tie line;transmission line;high voltage transmission;number of classrooms;number of water;adaptable program loan;regional economic integration;regional power market;transmission system;power transfer;electricity connection;fiduciary capacity;installed capacity;aids campaign;transmission connection;economic competitiveness;power station;transmission capacity;primary level;direct beneficiaries;health facility;mining industry;social infrastructure;energy shortage;domestic demand;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Luengo,Manuel
Africa - AFCC2/RI-3A-Southern Afr Power Mrkt APL 1 (FY04) : P069258 - Implementation Status Results Report : Sequence 26 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/616891475264055815/Africa-AFCC2-RI-3A-Southern-Afr-Power-Mrkt-APL-1-FY04-P069258-Implementation-Status-Results-Report-Sequence-26