DETAILS
-
2019/05/01
-
Environmental Assessment
-
SFG3212
-
5
-
2019/10/22
-
Disclosed
-
Analyse Environnementale Initiale pour Pose d’un Cable Sous Fluviatile pour Relier Sedhiou a Partir de Sandigniery sur 3.2 km
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 697
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Ankh Consultants.
Senegal - Electricity Sector Support Project : Environmental Assessment (Vol. 5 of 10) : Analyse Environnementale Initiale pour Pose d’un Cable Sous Fluviatile pour Relier Sedhiou a Partir de Sandigniery sur 3.2 km (French). Senegal : Ankh Consultants. http://documents.worldbank.org/curated/en/624771571817982629