Skip to Main Navigation

Vietnam - Coastal Cities Sustainable Environment Project : environmental assessment (Vol. 3) : Environmental and social impact assessment for Dong Hoi city sub-project (English)

The objective of the Coastal Cities Sustainable Environment Project for Vietnam is to sustain the efficiency of environment investment and strengthen the utility reform agenda concerning sanitation sector in the project cities. Negative impacts include: wastewater, solid waste, hazardous waste, water pollution, impacts on living creatures and aquatic species, impacts on urban beauty and landscape, flooding, erosion and sedimentation, subsidence, traffic safety issues, infrastructural works and existing services. Mitigation measures include: to ensure that all sources of pollution arising from the Project activities during the preparation stage and the construction stage as well as in the operation period will not cause any negative impacts on the environment and public health, it is compulsory that the management, monitoring and supervision of environmental quality be executed in a scientific, systematic and regular manner; and the locations are considered to propose mitigation measures for controlling pollution during operation phase such as Nhon Binh WWTP, A-4 cell in Long My landfill. Those mitigation measures include: waste sludge treatment, discharge incident, leaking chemical, odor treatment, and firefighting. For the other works, mitigation measures mainly are: checking and periodic maintenance and periodic dredging for culvert system.

Details

  • Author

    Phung,Tuyet Thi

  • Document Date

    2016/10/05

  • Document Type

    Environmental Assessment

  • Report Number

    SFG2528

  • Volume No

    3

  • Total Volume(s)

    4

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2016/10/05

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental and social impact assessment for Dong Hoi city sub-project

  • Keywords

    construction site;construction material;traffic lane;water supply and drainage;coastal sea water quality;surface water quality monitoring;wastewater collection and treatment;occupational safety and health;construction activities;traffic disruption;construction phase;daily activity;case of emergency;solid waste collection;construction of drains;public consultation;warning signs;environmental protection plan;critical natural habitats;strategic environmental assessment;law and regulation;risks of erosion;code of conduct;power and water;solar energy equipment;construction of school;surface water source;impact on health;road construction material;Environmental Management Plan;wastewater treatment plant;total suspended solid;environmental protection measures;implementation of mitigation;construction of road;drinking water supply;transportation of materials;national power grid;impacts on agriculture;water supply pipeline;environmental protection efforts;environmental protection requirements;wastewater treatment process;environmental management system;environmental related activities;disposal site;construction area;urban landscape;rice field;mitigation measure;land acquisition;social impact;Safeguard Policies;safeguard policy;pumping station;domestic wastewater;electricity lines;transport time;water surface;construction plant;heavy metal;dredged material;water bodies;speed limit;worker camp;aquaculture farm;community monitoring;allowable limits;environmental monitoring;work shift;food stalls;power line;class time;public toilet;irrigation canal;Proposed Investment;road base;construction schedule;heavy rain;environmental aspect;vegetation cover;environmental issue;environmental compliance;rainy season;living condition;positive impact;reinforced concrete;residential area;sanitation conditions;management regulation;land area;transportation Vehicles;transport route;applicable law;pile driving;parking area;erosion risk;construction method;daily life;construction road;construction impact;stagnant water;construction waste;Waste Material;bus station;waste water;septic tank;stormwater runoff;top soil;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Phung,Tuyet Thi

Vietnam - Coastal Cities Sustainable Environment Project : environmental assessment (Vol. 3) : Environmental and social impact assessment for Dong Hoi city sub-project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/627291475822025666/Environmental-and-social-impact-assessment-for-Dong-Hoi-city-sub-project