Skip to Main Navigation

Tunisia - Tunisia-Italy Power Interconnector Project Preparation Technical Assistance (Arabic)

Details

  • Document Date

    2017/10/10

  • Document Type

    Integrated Safeguards Data Sheet

  • Report Number

    120423

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Tunisia,

  • Region

    Middle East and North Africa,

  • Disclosure Date

    2018/04/24

  • Disclosure Status

    Disclosed

  • Doc Name

    Tunisia - Tunisia-Italy Power Interconnector Project Preparation Technical Assistance

  • Keywords

    Access to Information Policy;Environmental and Social Management System;Environmental and Social Impact;Environmental and Social Safeguard;health and safety risk;protection of cultural heritage;community health and safety;public-private partnership;loss of livelihood;maintenance and repair;construction and operation;international environmental treaties;resettlement action plan;bank's performance;local nongovernmental organization;Social Impact Assessment;renewable energy target;impacts on biodiversity;invasive alien species;threats to biodiversity;public private partnership;adverse environmental impact;Social Assessment;land acquisition;mitigation measure;ecosystem service;marine biodiversity;Resource Efficiency;Indigenous Peoples;public consultation;environmental safeguard;environmental survey;social aspect;bulk transmission;habitat alteration;sea route;forest fire;environmental implication;safety aspect;environmental characteristic;identification process;labor condition;submarine cable;electromagnetic field;physical work;marine area;thermal radiation;transmission capacity;management cost;citizen engagement;environmental permit;financial structure;Environmental Assessment;economic welfare;power network;legal framework;kv substation;maximum amount;physical characteristic;physical infrastructure;undersea cable;power system;nutrient loading;accessible location;affected persons;labor influx;worker camp;pollution prevention;cumulative impact;habitat loss;hydrological change;project datum;electricity system;safe operation;regulatory structure;governance arrangement;site selection;financial model;private provider;safeguards data;gap analysis;permit process;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Tunisia - Tunisia-Italy Power Interconnector Project Preparation Technical Assistance (Arabic). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/635811524597076675/Tunisia-Tunisia-Italy-Power-Interconnector-Project-Preparation-Technical-Assistance