Details
-
Author
-
Document Date
2012/01/03
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR5665
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2012/01/03
-
Disclosure Status
Disclosed
-
Doc Name
Iraq - IQ-TF EMERG. BAGHDAD WATER SUPPLY : P087912 - Implementation Status Results Report : Sequence 18
-
Keywords
raw water pumping station;house connection;emergency recovery loan;cubic meter of water;quantity of water;drinking water networks;capacity building support;reconstruction and rehabilitation;basic water supply;Recipient Executed Activities;financial agreement;Sanitation Services;treatment facilities;water pipe;sewerage network;chemical process;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Agha Al Nimer,Sana Kh.H.
Iraq - IQ-TF EMERG. BAGHDAD WATER SUPPLY : P087912 - Implementation Status Results Report : Sequence 18 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/675371468771849207/Iraq-IQ-TF-EMERG-BAGHDAD-WATER-SUPPLY-P087912-Implementation-Status-Results-Report-Sequence-18