This report includes environmental impact assessments and action plans for the Second Fujian Highway Project, which constructs the Zhangzhou-Zhao'an Expressway and an interconnecting road and bridge program to relieve traffic congestion and improve the mobility and integration of inter-provincial trade, commerce, and tourism between Fujian and Guangdong provinces. Negative environmental impact mitigation include: Road surfaces, excavation areas, and construction sites will be sprayed with water and kept moist. Trucks will be distanced from residential sites or other sensitive spots. Ventilation fans will reduce air pollution. Asphalt mixing equipment will have dust collectors and be distanced from residential areas. Vegetation restoration including greenbelts on roadsides will rehabilitate the land. Afforestation, a soundproofing screen, and a restricted schedule for operating construction equipment and vehicles will reduce noise levels. Dumping levels will not exceed the surrounding ground level, intercepting ditches will be installed, blind pipes will discharge seepage, and borrow and spoil sites will be reconstructed or leveled after construction. To prevent water pollution, oil collection tanks, oil-water separators, garbage collecting stations, drainage gates, and controlled sand digging will be used, along with treatment of wastewater and sewage. Hazardous materials will be strictly monitored. Displaced persons will be resettled and compensated.
Details
-
Author
Xian Highway Transportation University, Fujian Pr
-
Document Date
1999/04/30
-
Document Type
Environmental Assessment
-
Report Number
E254
-
Volume No
2
-
Total Volume(s)
9
-
Country
-
Region
-
Disclosure Date
2010/07/01
-
Disclosure Status
Disclosed
-
Doc Name
Zhangzhou-Zhaoan Expressway : Environmental Action Plan
-
Keywords
animals,aquatic plants,aqueducts,asphalt,Chemical Oxygen Demand,COD,Construction,construction stage,construction work,discharge,Dissolved Oxygen,ditches,domestic sewage,drainage,drainage system,earthworks,ecosystem,electricity,Environmental Impact,Environmental Impact Assessment,environmental issues,ENVIRONMENTAL MANAGEMENT,ENVIRONMENTAL MONITORING,ENVIRONMENTAL PROTECTION,farmers,farming,garbage,gas,irrigation,irrigation canals,irrigation channels,irrigation water,land use,mixers,Nitrogen,pH,pollution,ponds,Quality Standards,rainy seasons,retaining walls,River System,rivers,runoff,runoff water,sand,Sanitation,screens,Sea,Sea water,Seawater,septic tanks,sewage,sewage disposal,Ships,silting,soil erosion,surface water,surface water quality,surface waters,Suspended Particles,tanks,toxic substances,trees,washing,waste,wastewater,water content,water pollution,water quality
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Xian Highway Transportation University Fujian Pr
China - Second Fujian Highway Project (Vol. 2) : Zhangzhou-Zhaoan Expressway : Environmental Action Plan (Portuguese). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/688831468219585210/Zhangzhou-Zhaoan-Expressway-Environmental-Action-Plan