Details
-
Author
-
Document Date
2021/06/28
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR47035
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/06/28
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - Integrated Transport - P102368 - Sequence No : 25
-
Keywords
urban road infrastructure investment; centralized traffic control; financial management reporting; number of complaints; average travel time; vehicle operating cost; length of road; Investment Project Financing; finance and economic; road section; Urban Infrastructure; road sector; Output and Performance Based; construction work; operation risk; risk category; Road Accidents; project road; road condition; movement restriction; project intervention; baseline data; result indicator; proposal validity; procurement process; institutional strengthening; work contracts; rural transportation infrastructure
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Jijo,Mesfin Wodajo
Disclosable Version of the ISR - Integrated Transport - P102368 - Sequence No : 25 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/691681624908804833/Disclosable-Version-of-the-ISR-Integrated-Transport-P102368-Sequence-No-25