Skip to Main Navigation

Vietnam - Rural Distribution Project : resettlement plan (Vol. 1 of 67) : Resettlement plan for Dong Hoi -Ba Don 110kV transmission line - circuit two of Quang Binh province (English)

The development objective of the Rural Distribution Project for Vietnam focuses on rehabilitating and increasing the capacity of existing distribution lines and substations and standardizing them to enable them to meet the growing demand more efficiently, provide better quality and quantity of electric power for productive uses, and reduce power system losses. The resettlement plan (RP) evaluated the impact on project affected peoples (PAPs). In this...
See More

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

No. 1 Power Construction Consultancy Co. Ltd.; PC2 Power Engineering and Consulting Center.

Vietnam - Rural Distribution Project : resettlement plan (Vol. 1 of 67) : Resettlement plan for Dong Hoi -Ba Don 110kV transmission line - circuit two of Quang Binh province (English). s.l. ; s.n.. http://documents.worldbank.org/curated/en/697881468321528216

This document is being processed or is not available.