Details
-
Author
0000A8056
-
Document Date
2015/06/01
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR18947
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2015/06/01
-
Disclosure Status
Disclosed
-
Doc Name
South Asia - Nepal-India Electricity Transmission and Trade Project : P115767 - Implementation Status Results Report : Sequence 08
-
Keywords
kv transmission line;Integrated Financial Management Information System;power system;contract agreement;supply of electricity;quantity of electricity;Energy and Mining;construction activities;land parcel;land acquisition;load growth;private land;advance payment;generation expansion;transmission capacity;short period;Advisory services;cadastral map;forest clearance;transmission planning;collect land;investment loan;planning criteria;adequate capacity;alternative measure;contract duration;ground level;kv substation;electricity trade;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
0000A8056
South Asia - Nepal-India Electricity Transmission and Trade Project : P115767 - Implementation Status Results Report : Sequence 08 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/700351468294068025/South-Asia-Nepal-India-Electricity-Transmission-and-Trade-Project-P115767-Implementation-Status-Results-Report-Sequence-08