Skip to Main Navigation

China - Shandong Power Plant Flue Gas Desulfurization Project (English)

The China Shandong Power Plant Flue Gas Desulfurization Project was rated as follows: outcomes were unsatisfactory, risk to development outcome was moderate, and both Bank and borrower performance were unsatisfactory. The lessons learned during this project are - (1) A project supporting mandatory targets should carefully time project support with the targets' timeline. (2) Early communication to the final borrowers of the Bank's project cycle and timing of availability of funding is needed, especially when working with corporations. (3) Advance procurement of technical assistance, on a retroactively financed basis, and greater attention to final recipients of the technical assistance could mitigate risks of poor loan-financed TA execution. (4) Strong project management units are needed to support finance bureaus in supervising multiple subprojects. (5) The Bank needs to be more proactive and clearer on initiating project restructuring.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

China - Shandong Power Plant Flue Gas Desulfurization Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/711861468219578837/China-Shandong-Power-Plant-Flue-Gas-Desulfurization-Project