Skip to Main Navigation

Madagascar - Integrated Growth Poles Project : resettlement action plan (Vol. 13) : Plan d'action de réinstallation involontaire (French)

The resettlement action plan (RAP) for the Madagascar Integrated Growth Poles Project includes the country ' s regulatory and legal frameworks, and the Bank ' s safeguard policies, and principles for resettlement, stipulating the criteria for ensuring compensation to project affected people (PAP) as required, due to subprojects implementation. The RAP addresses the following mitigating measures: cultural heritage sites are to be protected and respected in compliance with the country ' s legislation, and the Bank safeguards policy; mitigation measures for project affected people (PAP) will ensure that PAPs will gain benefit from the project and improve their standard of living; measures necessary to mitigate adverse impacts will be determined with participation of the displaced persons during design and implementation of the project; addressing the needs of displaced PAPs will be a priority during periods of transition and adaptation to new or temporary settlements; compensation to PAPs for the cost of losses from involuntary relocation, as required; and the previous level of community services and access to resources will be maintained or improved after resettlement.

Details

  • Author

    APC ECR Land Ressources Techsult International Limitee

  • Document Date

    2011/12/01

  • Document Type

    Resettlement Plan

  • Report Number

    RP307

  • Volume No

    13

  • Total Volume(s)

    14 (See all volumes)

  • Country

    Madagascar,

  • Region

    Africa,

  • Disclosure Date

    2012/05/16

  • Disclosure Status

    Disclosed

  • Doc Name

    Plan d'action de réinstallation involontaire

  • Keywords

    displaced people, adults, air, civil society, resettlement, voluntary resettlement, vulnerable groups, climate, communities, buses, districts, economic development, families, habitat, health care, health care workers, households, housing, human rights, hygiene, income, inhabitants, intervention, land use, laws, legal framework, local populations, migration, natural heritage, natural resources, non-governmental organizations, partnership, personality, population growth, private sector, public participation, safety, quality of life, regional development, regional planning, regulatory framework, resettlement, rural communities, safety, social conditions, social studies, towns, traffic, transportation, unemployment, Urban Planning, urbanization, villages, waste, waste disposal, water supply, workers

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

APC ECR Land Ressources Techsult International Limitee

Madagascar - Integrated Growth Poles Project : resettlement action plan (Vol. 13) : Plan d'action de réinstallation involontaire (French). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/719151468054229541/Plan-daction-de-réinstallation-involontaire