Skip to Main Navigation

Indonesia - Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project : P112158 - Implementation Status Results Report : Sequence 04 (English)

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Johansen,Peter

Indonesia - Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project : P112158 - Implementation Status Results Report : Sequence 04 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/719671468282875422/Indonesia-Upper-Cisokan-Pumped-Storage-Hydro-Electrical-Power-1040-MW-Project-P112158-Implementation-Status-Results-Report-Sequence-04