Details
-
Author
-
Document Date
2020/06/24
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR42367
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/06/24
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) - P125590 - Sequence No : 11
-
Keywords
operations and maintenance; road safety audit; vehicle operating cost; operation and management; Investment Project Financing; reduction in travel; consultancy service; contract provision; operation risk; project road; risk category; road corridor; effective performance; road asset; transport cost; road section
See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Tvgssshrk,Pratap
Disclosable Version of the ISR - UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) - P125590 - Sequence No : 11 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/723011593031020796/Disclosable-Version-of-the-ISR-UGANDA-North-Eastern-Road-corridor-Asset-Management-Project-NERAMP-P125590-Sequence-No-11