Skip to Main Navigation

Vietnam - Rural Distribution Project : resettlement plan (Vol. 38) : Resettlement plan for Phu Chan 110kv substation and feeders (English)

The development objective of the Rural Distribution Project for Vietnam focuses on rehabilitating and increasing the capacity of existing distribution lines and substations and standardizing them to enable them to meet the growing demand more efficiently, provide better quality and quantity of electric power for productive uses, and reduce power system losses. The resettlement plan (RP) evaluated the impact on project affected peoples (PAPs). In this regard, the following mitigation measures will be applied : acquisition of land and other assets, and resettlement of people will be minimized as much as possible; all PAPs residing, working, doing business, or cultivating land in the right of way (ROW) of transmission lines, surrounding areas of tower foundations, substation areas, or service roads will be provided with rehabilitation measures to assist them to improve or at least maintain their pre-project living standards, income earning capacity, and production levels; displaced peoples (DPs) raising complaints and grievances will be treated fairly and guided by the related agencies with procedures and formalities for lodging their complaints; the previous level of community services and resources will be maintained or improved; and finally, supervision, monitoring, and evaluation of the RP implementation will be carried out effectively and timely.

Details

  • Author

    No. 1 Power Construction Consultancy Co. Ltd. PC2 Power Engineering and Consulting Center

  • Document Date

    2009/01/20

  • Document Type

    Resettlement Plan

  • Report Number

    RP606

  • Volume No

    38

  • Total Volume(s)

    67 (See all volumes)

  • Country

    Vietnam,

  • Region

    East Asia and Pacific,

  • Disclosure Date

    2009/01/20

  • Disclosure Status

    Disclosed

  • Doc Name

    Resettlement plan for Phu Chan 110kv substation and feeders

  • Keywords

    land price;land acquisition;market value of land;quality of power supply;unit price;compensation at replacement;land use right;transfer of land;land use plan;agricultural land acquisition;local land use;rural power system;replacement cost;participation in planning;power system development;local power companies;management board;loss of income;resettlement and rehabilitation;compensation for loss;valuation of losses;cost of transport;income earning capacity;resettlement of people;law and regulation;acquisition of land;entitlement to compensation;standard of living;infrastructure and services;legal right;residential land;resettlement land;living standard;market price;resettlement policy;international agreement;community meetings;rural area;transfer tax;resettlement sites;involuntary resettlement;power network;Ethnic Minorities;nature reserve;dwelling house;power loss;market place;technical standard;price verification;salvage material;socio-economic survey;productive land;telecommunication system;cash compensation;resettlement assistance;transmission line;information dissemination;residential area;resettlement plan;infrastructure facility;distribution network;agricultural product;domestic law;Funding agencies;building material;investment cost;production cost;vulnerable group;income support;improved public;socio-economic development;market cost;productive asset;annual crop;cash value;average production;construction site;rehabilitation assistance;organizational structure;agricultural production;government regulation;compensation calculation;prevailing price;production level;distribution line;land clearance;Land Registration;permanent resident;land right;transition period;productive potential;electricity price;racial discrimination;industrial zone;state control;management capacity;residential registration;good character;development policy;spiritual life;legal framework;tax receipt;displaced person;power line;land law;settlement procedure;national assembly;land management;Effective Date;Resettlement projects;land recovery;site selection;land plot;power capacity;national interest;effective participation;Land tenure;compensation payment;eligibility criterion;public consultation;baseline information;monitoring agency;approval process;public meeting;telephone system;heavy equipment;project construction;qualified consultant;social safeguard;financial resource;civil law;management oversight;impact survey;architectural structures;internal monitoring;restoration measure;

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

No. 1 Power Construction Consultancy Co. Ltd. PC2 Power Engineering and Consulting Center

Vietnam - Rural Distribution Project : resettlement plan (Vol. 38) : Resettlement plan for Phu Chan 110kv substation and feeders (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/730491468172171725/Resettlement-plan-for-Phu-Chan-110kv-substation-and-feeders