Details
-
Author
-
Document Date
2014/12/15
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR17369
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Doc Name
Bangladesh - Rural Electrification and Renewable Energy Development II (RERED II) Project : P131263 - Implementation Status Results Report : Sequence 27
-
Keywords
Rural Electrification and Renewable Energy Development;Solar Home System;Access to Electricity;rural area;efficient energy consumption;Energy and Mining;compact fluorescent lamp;number of connections;irrigation pump;cook stove;biogas plant;
See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Sadeque,Zubair K.M.
Bangladesh - Rural Electrification and Renewable Energy Development II (RERED II) Project : P131263 - Implementation Status Results Report : Sequence 27 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/734041468198849632/Bangladesh-Rural-Electrification-and-Renewable-Energy-Development-II-RERED-II-Project-P131263-Implementation-Status-Results-Report-Sequence-27